Freguesia do Ó (São Paulo Metro)

From Wikipedia, the free encyclopedia
Freguesia do Ó
General information
LocationAv. Miguel Conejo × Tv. da Mona Lisa
Freguesia do Ó
Brazil
Owned by Government of the State of São Paulo
Operated by LinhaUni
PlatformsSide platforms
Construction
Structure typeUnderground
AccessibleYes
Other information
Station codeFRE
History
Opening2025
Services
Preceding station São Paulo Metro Following station
João Paulo I
towards Brasilândia
Line 6
(under construction)
Santa Marina
towards São Joaquim
Track layout

Freguesia do Ó will be one of the future stations of São Paulo Metro and will belong to Line 6-Orange, which is under construction. In its first phase, with 15.9 km (9.9 mi) of extension, Line 6 should connect Brasilândia, in the North Side, to São Joaquim station of Line 1-Blue. Later, the line should connect Rodovia dos Bandeirantes to the borough of Cidade Líder, in the East Side.

The station will be located in the confluence between Avenida Miguel Conejo, Rua Bonifácio Cubas and Travessa da Mona Lisa.[1]

The construction of the station began in 2016, when the opening date was estimated to mid-2020.[2] Later, Governor Geraldo Alckmin promised the opening of the first phase of the line to 2020, time which was discarded due to a year of delay in the financing of the Federal Savings Bank, which would be used for the expropriations. In June 2016, the opening of the line was estimated for 2021,[3] time kept in October 2017, when the resume of the construction was announced for the beginning of 2018.[4][5][6] Currently,[specify] the construction is suspended, due to the involvement of the construction companies of the Move São Paulo consortium (Odebrecht, Queiroz Galvão, UTC Participações) in Operation Car Wash, which caused them to not get the financing of R$ 5.5 billions (US$ 1,575,344,427.58) with the Brazilian Development Bank (BNDES) for the continuity of the construction. The State Government of São Paulo is currently in negotiations with international companies, including Spanish Acciona[7] and Chinese China Railway Construction Corporation.[8]

Characteristics[edit]

Buried station with side platforms, structure in apparent concrete and support rooms at-grade. It will have access for people with disabilities. With a total area of 11,560 m2 (124,400 sq ft), it will also have four underground levels and an estimated transit of 15,000 passengers per day.[9]

References[edit]

  1. ^ "Empreendimentos do Metrô - Maio/2013" (PDF) (in Portuguese). Companhia do Metropolitano de São Paulo. May 2013. Archived from the original (PDF) on 20 December 2016. Retrieved 25 January 2020.
  2. ^ Meier, Ricardo (22 June 2016). "Linha 6 já tem três estações em obras, mas data de inauguração sofrerá atraso" (in Portuguese). Metrô CPTM. Retrieved 25 January 2020.
  3. ^ Palhares, Isabela (22 June 2016). "Linha 6-Laranja do Metrô será entregue em 2021, diz Alckmin" (in Portuguese). Estadão. Retrieved 25 January 2020.
  4. ^ Leite, Fabio (4 October 2017). "Grupo chinês deve 'comprar' Linha 6 do Metrô e retomar obra parada" (in Portuguese). Estadão. Retrieved 25 January 2020.
  5. ^ Santiago, Tatiana (22 June 2016). "Linha 6-Laranja do Metrô de SP será entregue com um ano de atraso" (in Portuguese). G1. Retrieved 25 January 2020.
  6. ^ Lobo, Renato (6 February 2017). "Metrô amplia prazo das obras da Linha 6-Laranja" (in Portuguese). Via Trólebus. Retrieved 25 January 2020.
  7. ^ Lobo, Renato (23 January 2020). "Doria se reúne com possível futuro operador da Linha 6-Laranja do Metrô" (in Portuguese). Via Trólebus. Retrieved 25 January 2020.
  8. ^ Meier, Ricardo (19 October 2019). "Empresa chinesa CR20 teria fechado acordo para assumir Linha 6-Laranja" (in Portuguese). Metrô CPTM. Retrieved 25 January 2020.
  9. ^ "Estação Freguesia do Ó" (PDF) (in Portuguese). Companhia do Metropolitano São Paulo. Retrieved 30 January 2020.

External links[edit]