Talk:Ontario Highway 410/GA1
GA Review[edit]
GA toolbox |
---|
Reviewing |
Article (edit | visual edit | history) · Article talk (edit | history) · Watch
Reviewer: Grondemar (talk · contribs) 16:08, 18 February 2012 (UTC)
This article in general looks good; I have a few concerns that need to be addressed before the review can be passed:
- It's a little confusing that the Route description runs south-to-north, while the Exit list runs north-to-south. Is there a way to get the two sections running in the same direction?
- "From this point north to Bovaird Drive, the two highways were concurrent." Aren't they still concurrent?
- "Ernie Eves" who is that? The name is thrown into the beginning of a paragraph with no explanation on who is this and why they are important.
- It would be nice if the bare URLs in the citations could be cleaned up, either using citation templates or by hand.
- It is reasonably well written.
- It is factually accurate and verifiable.
- a (references): b (citations to reliable sources): c (OR):
- a (references): b (citations to reliable sources): c (OR):
- It is broad in its coverage.
- a (major aspects): b (focused):
- a (major aspects): b (focused):
- It follows the neutral point of view policy.
- Fair representation without bias:
- Fair representation without bias:
- It is stable.
- No edit wars, etc.:
- No edit wars, etc.:
- It is illustrated by images, where possible and appropriate.
- a (images are tagged and non-free images have fair use rationales): b (appropriate use with suitable captions):
- a (images are tagged and non-free images have fair use rationales): b (appropriate use with suitable captions):
- Overall:
- Pass/Fail:
- This GAN is placed on hold for a minimum of seven days to allow the above concerns to be addressed.
- Pass/Fail:
Thanks. –Grondemar 16:31, 18 February 2012 (UTC)
- Thank you for the review! Regarding your first point, both flow from south to north (Highway 401 is at the southern end, and at the northern end is Highway 10) I've reworded the sentence for the second point, but essentially Highway 7 was made concurrent with the highway in the 1980s, but then decommissioned through Brampton in 1997 (although, for some reason the signs are still there on the freeway for both 7 and 410). The last point I still have to address; will respond again when I've dealt with it. - ʄɭoʏɗiaɲ τ ¢ 18:47, 18 February 2012 (UTC)