Qimei Power Plant

Coordinates: 23°11′37.5″N 119°25′19.8″E / 23.193750°N 119.422167°E / 23.193750; 119.422167
From Wikipedia, the free encyclopedia

Qimei Power Plant
Map
Official name七美發電廠
CountryTaiwan
LocationNangang, Cimei, Penghu
Coordinates23°11′37.5″N 119°25′19.8″E / 23.193750°N 119.422167°E / 23.193750; 119.422167
StatusOperational
Commission date23 July 1998 (unit 1)
30 June 2006 (unit 2)
6 August 2005 (unit 3)
1 July 2001 (unit 4)
Owner(s)Taipower
Operator(s)Taipower
Thermal power station
Primary fuelDiesel fuel
Power generation
Units operational4 × 1,000 kW
External links
CommonsRelated media on Commons

The Qimei Power Plant (Chinese: 七美發電廠; pinyin: Qīměi Fādiànchǎng) is a fuel-fired power plant in Nangang Village, Cimei Township, Penghu County, Taiwan. It is the only power plant on Cimei Island.

History[edit]

On 20 June 1974, Taiwan Power Company took over a power plant currently operating on the island with a capacity of 2x120 kW. The plant only powered up to a maximum 10 hours per day only. In 1978, the power plant was rebuilt at the current site with a generation capacity of 500 kW using diesel engine. The plant was then able to supply around 13–16 hours of electricity per day to the local residents. In 1981, three units of 500 kW generator were added to the plant to increase its generation capacity. Starting 1 February 1984, the power plant could supply electricity to the local residents for 24 hours a day. Over the years due to the growing demand, the installed 4 units of 500 kW generator became insufficient to keep supplying electricity. Thus, in 1998, 2001 and 2006, the power plant was overhauled to replace its generator from 500 kW to 1,000 kW capacity.[1][2][3][4]

See also[edit]

References[edit]

  1. ^ "區營業處首頁". 8 April 2014.
  2. ^ Document tri.org.tw [dead link]
  3. ^ "Offshore Island Power". Taipower. 15 May 2020. Retrieved 31 December 2020.
  4. ^ "七美電廠" [Qimei Power Plant]. 台灣電力公司 (in Chinese). September 2020. Retrieved 1 January 2021.