North–South Railway (Brazil)

From Wikipedia, the free encyclopedia
North-South Railway
View of the Estreito MA Railroad Bridge, part of the North-South Railway.
Overview
Service typeInter-city
StatusOperational
LocaleMaranhão
Tocantins
Goiás
Minas Gerais
São Paulo
First service1996 (1996)
Current operator(s)VLI Multimodal S.A. (Maranhão to Tocantins)
Rumo Logística (Tocantins to São Paulo)
Route
Distance travelled2,184 kilometres (1,357 mi)
4,155.6 kilometres (2,582.2 mi) estimated
Technical
Track gaugeBroad-gauge

North-South Railway (Portuguese: Ferrovia Norte-Sul), also known as EF-151, is a Brazilian longitudinal broad-gauge railroad. It was designed to connect the lines that provide access to Brazil's main ports and producing areas, which had been regionally isolated. Once completed, it will cover 4,155 kilometers and cross the states of Pará, Maranhão, Tocantins, Goiás, Minas Gerais, São Paulo, Mato Grosso do Sul, Paraná, Santa Catarina and Rio Grande do Sul.[1]

Its current route stretches from Açailândia (MA) to Estrela d'Oeste (SP). The section between Açailândia (MA) and Porto Nacional (TO) belongs to the VLI concessionaire, and the one between Rio Verde (GO) and Estrela d'Oeste (SP) belongs to the Rumo Logística concessionaire. The stretch between Açailândia (MA) and Anápolis (GO) was completed in 2014, while the stretch between Ouro Verde de Goiás (GO) and Estrela d'Oeste (SP) was completed in 2023.[2][3][4][5]

The northern extension has two projects filed with the Ministry of Infrastructure, one by Minerva Participações e Investimentos and one by VALE. The southern extension continues under development with no date for execution.[6][7]

Features[edit]

The North-South Railway connects with the Carajás Railway in Açailândia (MA), which leads to the port of Itaqui. Departing from Porto Franco (MA), it will connect with the Transnordestina Railway, currently under construction by Transnordestina Logística S.A., after implementation of the line to Eliseu Martins (PI), which will provide alternative access to the ports of Suape (PE) and Pecém (CE). It will also connect with the West-East Integration Railway (FIOL) in Figueirópolis (TO) and with the Trans-Amazonian Railway in Mara Rosa (GO). In Anápolis (GO), north–south connects with the Central-Atlantic Railway, which operates in metre-gauge and requires transshipment. At Estrela d'Oeste (SP), the railroad connects with Rumo Logística's Malha Paulista, which provides access to the port of Santos and the economic and industrial hub of São Paulo. From the Malha Paulista, it is also possible to access Ferronorte, which continues to Mato Grosso.[8][9][10][11]

The North-South Railway has a minimum curve radius of 343 meters and a maximum ramp of 0.6%, which allows a maximum speed of 83 kilometers per hour. Throughout a portion of its route in Goiás, Tocantins and Maranhão, the railroad runs parallel to the Belém-Brasília highway (BR-153; BR-226 and BR-010) and the Tocantins River. On the border between the states of Goiás and Minas Gerais, it crosses the Paranaíba River, which is part of the Tietê-Paraná Waterway.[12][13][1]

History[edit]

The North-South Railway was first discussed in 1985 during José Sarney government. The initial route envisaged a length of approximately 1,550 kilometers between Açailândia (MA) and Anápolis (GO). Work on the first stretch of 215 kilometers between Açailândia (MA) and Porto Franco (MA) began in 1987 and ended in 1996 under Fernando Henrique Cardoso administration. During the first term of President Luiz Inácio Lula da Silva, the construction of the railroad to Porto Nacional (TO) and Anápolis (GO) restarted. The first stretch of 146 kilometers between Porto Franco (MA) and Araguaína (TO) was inaugurated in 2007.[14][15][16][17][18]

First train pulling iron ore loaded in Porto Nacional at North-South Railway. The previous trains were loaded in Guaraí.

In October 2007, the operation of the stretch of the North-South Railway between Açailândia (MA) and Porto Nacional (TO) was granted to Vale S.A. for a 30-year period. The company offered the minimum amount of R$1.478 billion, with half being paid on December 21, 2007, and the other half divided into two installments. The stretch granted covered 722 kilometers, but only 361 kilometers between Açailândia (MA) and Araguaína (TO) had been completed by October 2007. The money provided by the concession enabled the construction of the portion of 359 kilometers between Araguaína (TO) and Porto Nacional (TO).[19][20][21]

In December 2008, a 490 kilometer stretch between Açailândia (MA) and Colinas (TO) was completed. In March 2010, the 133 kilometer stretch between Colinas (TO) and Guaraí (TO) was inaugurated. The stretch between Colinas (TO) and Porto Nacional (TO), originally scheduled to be inaugurated in September 2010 by President Luiz Inácio Lula da Silva, began running at the end of 2012. In 2011, Vale S.A. dismembered the north–south operation, merged it with the Central-Atlantic Railway and established a company dedicated to logistics called VLI Multimodal S.A., which began to operate and manage the Açailândia (MA) and Porto Nacional (TO) stretch.[22][23][24][25]

In January 2011, work began on the 684 kilometer segment between Ouro Verde de Goiás (GO) and Estrela d'Oeste (SP). It was the first route outside of the initial project, which had been designed to reach Anápolis (GO) and was modified to extend to the port of Rio Grande (RS). The 855 kilometer section between Porto Nacional (TO) and Anápolis (GO), scheduled for 2010, was delivered in 2014 by President Dilma Rousseff without any operational terminal, which required investments of R$700 million in intermodal freight yards, viaducts and signage by the new operator. The segment between Ouro Verde de Goiás (GO) and Estrela d'Oeste (SP), scheduled for conclusion in the second half of 2018, was delivered 95% complete.[26][27][28][29]

Signing ceremony for the concession contract for the central stretch of the North-South Railway with Rumo Logística on July 31, 2019.

On July 20, 2018, President Michel Temer signed Provisional Measure 845, which established the National Railway Development Fund (Fundo Nacional de Desenvolvimento Ferroviário - FNDF). It guaranteed that the entire amount paid for the concession of the stretch of the North-South Railway between Porto Nacional (TO) and Estrela d'Oeste (SP) would be allocated to the construction of the northern extension, connecting Açailândia (MA) to the port of Vila do Conde, in Barcarena (PA).[30][31]

On March 28, 2019, the Jair Bolsonaro government auctioned off the 1,537 kilometer central stretch of the North-South Railway between Porto Nacional (TO) and Estrela d'Oeste (SP). Rumo Logística acquired the railroad for R$2,719,530,000 for a 30-year non-extendable concession contract, signed in Goiás on July 31, 2019.[32][33][34][35]

On March 4, 2021, Rumo launched operations on the stretch between São Simão (GO) and Estrela d'Oeste (SP) after investments of R$711 million. A terminal was built in São Simão with a storage capacity of 42,000 tons and a transport capacity of 5.5 million tons of soybeans, corn and soybean meal per year. On May 29, 2021, the first train loaded with soybeans left the Multimodal Terminal in Rio Verde (GO) for the port of Santos. On June 9, 2022, the Iturama sugar terminal in the Triângulo Mineiro started operating in partnership with Usina Coruripe. On May 25, 2023, Rumo Logistica concluded the 50 kilometers of track remaining for the connection of the railroad between the towns of Goianira and Ouro Verde (GO).[36][37][38]

Route[edit]

Section Beginning of works Length (km) Length from Açailândia (km) Inauguration date Observations and connections
Barcarena (PA) - Açailândia (MA)[10] Undefined 477 450 Undefined Section included in the Federal Government's Pro-Trails Program (Programa Pró Trilhos). Construction and operation of the stretch by Minerva Participações e Investimentos S/A.[39][7]
Açailândia (MA) - Porto Franco (MA)[40] 1987 215 215 1996[41] Connects with: Carajás Railway in Açailândia (MA); MA-122 near João Lisboa (MA), BR-010 near Imperatriz (MA); MA-138 near Porto Franco (MA); 28 kilometers railroad branch line linking Suzano's factory in Imperatriz to the track.[42]
Porto Franco (MA) - Aguiarnópolis (TO)[41] Unknown 42 247 2007[41] Connects with: bridge over the Tocantins River between the cities of Estreito (MA) and Aguiarnópolis (TO); BR-226 near Aguiarnópolis (TO).
Aguiarnópolis (TO) - Araguaína (TO)[43] Unknown 114 361 2007[41] Crosses the Araguaína/Babaçulândia Multimodal Yard (TO)[44]
Araguaína (TO) - Colinas do Tocantins (TO)[45] Unknown 153 514 2008[41] Crosses the Colinas Multimodal Yard (TO)[44]
Colinas do Tocantins (TO) - Guaraí (TO)[43] Unknown 100 514 2010[41] Crosses the Guaraí Multimodal Yard (TO)[44]
Guaraí (TO) - Palmas (TO)[46] 2007 150 764 2010[41] Crosses the Palmas/Porto Nacional Multimodal Yard near the Luzimangues district (Porto Nacional - TO)[44]
Palmas (TO) - Uruaçu (GO)[47] 2008 456 1220 2012[41] Connects with: West-East Railway in Figueirópolis (TO); Center-West Integration Railway in Mara Rosa (GO). Crosses the Gurupi Multimodal Terminal (TO).[44][48]
Uruaçu (GO) - Anápolis (GO)[49] 2008 280 1500 2014[41] Connects with the Central-Atlantic Railway in Anápolis (GO)[50]
Ouro Verde (GO) - Estrela D'Oeste (SP)[27] 2011 684 2184 2021[41] Connects with the Malha Paulista. Terminals in Rio Verde (GO), Iturama and São Simão (MG)[51]
Estrela D'Oeste (SP) - Panorama (SP)[52] Undefined 264 2548 Undefined Project in progress
Panorama (SP) - Chapecó (SC)[53] Undefined 951 3499 Undefined Studies in progress
Chapecó (SC) - Rio Grande (RS)[54] Undefined 833 4332 Undefined Studies in progress

Southern Extension[edit]

The segment under study linking Panorama (SP) and Rio Grande (RS) is currently called the Southern Extension (Prolongamento Sul). It was divided into two sections:[52][55]

  • Panorama (SP) to Chapecó (SC), 951 kilometers;
  • Chapecó (SC) to Rio Grande (RS), 833 kilometers;

Originally, the stretch linking Panorama (SP) and Porto Murtinho (MS), labeled EF-267, was called the Southern Extension of the North-South Railway. On May 8, 2008, it was included in the National Road Plan, not as part of the north–south, but as a railroad that will connect to it, called the Pantanal Railway.[56]

North Extension[edit]

The stretch linking the port of Vila do Conde in Barcarena (PA) and Açailândia (MA) is called the Northern Extension (Prolongamento Norte) of the North-South Railway. On December 23, 2021, Minerva Participações e Investimentos S.A. signed the contract for the construction and operation of the stretch. On February 3, 2022, the Ministry of Infrastructure signed a contract with 3G Empreendimentos e Consultoria Ltda. for the construction of the section between Barcarena and Santana do Araguaia (PA). The companies' projects coincide in the municipalities of Barcarena and Rondon do Pará (PA).[7][57][58]

Branch lines[edit]

Currently, the railroad includes two branch lines:

  • A private section approximately 25 kilometers long owned by Suzano Papel e Celulose that connects its factory in Imperatriz (MA) to the North-South Railway in João Lisboa (MA);[59]
  • A section in Anápolis approximately 50 kilometers long that connects the North-South Railway in Ouro Verde de Goiás (GO) to the Agroindustrial District of Anápolis (GO), where it joins the metre-gauge network of the Central-Atlantic Railway.[60][61]

Operational stretches[edit]

Porto Nacional (TO) to Açailândia (MA)[edit]

VLI locomotive 8264 (EMD SD70), in São Luís (MA).

The 720-kilometer stretch between Porto Nacional (TO) and Açailândia (MA) is operated by VLI Multimodal S.A., owner of the Ferrovia Norte-Sul S.A. concessionaire. Compared to the use of trucks, the route saves 8% on grain transportation to the port of Itaqui. It mainly transports soybeans (55%), cellulose (25%) and fuels (10%). The trip between Porto Nacional and the Port of Itaqui lasts 3.5 days on average.[62][63]

The main product is soybeans, which are shipped from Porto Franco (MA) and Colinas do Tocantins (TO). It also transports pulp for Suzano Maranhão, which built its own 28 kilometer branch line from the factory in Imperatriz (MA) to the railroad destined for the port of Itaqui. It runs fuel transportation from São Luís to the terminal in Porto Nacional and plans to ship alcohol from Tocantins to the port of Itaqui. The volume handled by the terminal rose from 110 million to 270 million liters of fuel from 2014 to 2016.[64][62][65][29]

Between 2012 and 2015, grain flow increased from 2.6 to 4.2 million tons, 55% of the total volume transported on the stretch. The Porto Nacional Integrator Terminal has a storage capacity of 60,000 tons of grain and can process 2.6 million tons a year. The Palmeirante Terminal (TO) holds a 90,000 ton warehouse and can dispatch up to 3.4 million tons a year. The stretch is able to transport up to 9 million tons of grain a year, but suffers from a shortage of access roads to the tracks.[66][67][68]

From 2014 to 2017, 11.7 million tons of grain were shipped between Porto Nacional (TO) and the port of Itaqui. From January to October 2017, 5.5 million tons of grain were transported, 30% more than 2015. In April 2017, an axis that crosses 4 kilometers of the Araguaia River for trucks bound for Porto Nacional by ferry from Santana do Araguaia (PA) to Caseara (TO) began operating, which reduced travel times and increased the volume received from the east and northeast of Mato Grosso and the south of Pará by 7%. Between January and October 2017, the port of Itaqui transported 1.184 million tons of pulp and paper produced by the Suzano Papel e Celulose unit in Imperatriz (MA), delivered by the north–south and Carajás railroads.[69][63][70][71]

In 2018, it transported 6.3 million tons of soybeans, corn and soybean meal to the port of Itaqui. In 2019, the volume was 7.9 million tons of grain, from eastern and northeastern Mato Grosso, southern Pará and MATOPIBA (Maranhão, Tocantins, Piauí and Bahia), the new agricultural hotspot; an increase of 25% on the previous year.[72][73]

Porto Nacional (TO) to Anápolis (GO)[edit]

North-South Railway at intersection with Belém-Brasília Highway, in Imperatriz (MA)..

Since its inauguration until the concession, the stretch between Porto Nacional and Anapólis, under VALEC's management, has transported 18 locomotives (February 2015), 26,000 tons of soybean meal (December 2015), 13,000 tons of shredded wood (December 2016 to March 2017), 8,000 tons of manganese ore (October 2017) and 62 bars of rail measuring 240 meters each (December 2017). The capacity to transport new cargo through this section was limited by the lack of terminals and the inability to get the cargo to a port, constrained by the capacity on the Carajás Railway, which could only absorb new trains after the duplication was completed in 2018.[74][75][76][77]

Ouro Verde de Goiás (GO) to Estrela d'Oeste (SP)[edit]

In the first half of 2021, Rumo Logística launched operations on the Central-South extension of the North-South Railway and built two terminals. In São Simão (GO), a terminal with a static capacity of 42,000 tons and a transport capacity of 5.5 million tons of soybeans, corn and soybean meal per year was constructed with investments of R$711 million. In Rio Verde (GO), a large Multimodal Terminal for soybeans and fertilizers with the capacity to handle 11 million tons per year was built. On June 9, 2022, Rumo Logística and Usina Coruripe inaugurated a sugar terminal in Iturama (MG) capable of handling 2 million tons of export sugar per year. The Santa Helena de Goiás Multimodal Terminal is under construction by Infra S.A.[36][78][79][80]

The entire stretch between Porto Nacional (TO) and Estrela d'Oeste (SP) became fully operational in June 2023.[81]

See also[edit]

References[edit]

  1. ^ a b "Nos trilhos do progresso". Diário da Manhã. 2016-05-20. Retrieved 2024-02-21.
  2. ^ "Trecho da ferrovia Norte-Sul que corta o Triângulo Mineiro é liberado pela ANTT". G1. 2021-03-02. Retrieved 2024-02-21.
  3. ^ Toledo, Marcelo (2021-03-04). "Rumo inaugura operação da ferrovia Norte-Sul". Folha de S. Paulo. Retrieved 2024-02-21.
  4. ^ "Ferrovia Norte Sul (FNS)". VLI. Retrieved 2024-02-21.
  5. ^ Ferrovias autorizadas: Novo regime de construção e operação entra em vigor no Brasil (PDF). Rumo Logistica. 2021.
  6. ^ "Em dia de sanção do novo Marco Legal das Ferrovias, Pro Trilhos alcança 64 requerimentos e ultrapassa R$ 180 bilhões em investimentos projetados". Ministry of Transport. 2021-12-24. Retrieved 2024-02-21.
  7. ^ a b c "Contratos no valor de R$ 23,9 bilhões são celebrados para construção de ferrovias". O Liberal. 2022-02-07. Retrieved 2024-01-21.
  8. ^ "Trecho final da Ferrovia Norte-Sul vai diversificar cargas para o Porto de Santos". Revista OE. 2023-10-11. Retrieved 2024-02-21.
  9. ^ "Açailândia/MA - Palmas/TO". Valec. Retrieved 2024-02-21.
  10. ^ a b "BARCARENA/PA - AÇAIL NDIA/MA". Infra S.A. Retrieved 2024-02-21.
  11. ^ "Ferrovias para o futuro". FIEMT. 2021-09-02. Retrieved 2024-02-21.
  12. ^ "O mito da Ferrovia Norte-Sul". Amantes da Ferrovia. Retrieved 2024-02-21.
  13. ^ "Governo inaugura trecho da Ferrovia Norte-Sul entre Goiás e Porto de Santos". AecWeb. 2021-03-09. Retrieved 2024-02-21.
  14. ^ Verdélio, Andreia (2021-03-04). "Bolsonaro participa de inauguração de trecho da Ferrovia Norte-Sul". Agência Brasil. Retrieved 2024-02-21.
  15. ^ "Ferrovia Norte Sul: Saiba tudo sobre o projeto!". Massa. 2020-10-21. Retrieved 2024-02-21.
  16. ^ "Ferrovia Norte-Sul: FHC vs Lulilma". Conversa Fiada. 2013-10-27. Retrieved 2024-02-21.
  17. ^ Ribeiro, Juliana (2010-03-24). "Lula volta ao Tocantins no dia 9 de abril para lançar obras da Embrapa e inaugurar Ferrovia Norte-Sul". Tocantins State Government. Retrieved 2024-02-21.
  18. ^ Ribeiro, Alexandre (2019). "Análise de multimodalidade: Transporte de produtos da Zona Franca de Manaus-AM até a região de Campinas" (PDF). Dom Cabral Foundation.
  19. ^ "A Operação na Ferrovia Norte-Sul". Valec. Retrieved 2024-02-21.
  20. ^ Oliveira, Lourdes (2021). "Ferrovia Norte-Sul e os impactos econômicos dos terminais multimodais nos municípios do tramo norte" (PDF). PUC Goiás.
  21. ^ "Única interessada, Vale leva ferrovia Norte-Sul por R$ 1,4 bi". Folha de S. Paulo. 2007-10-03. Retrieved 2024-02-21.
  22. ^ "Trecho Colinas-Guaraí da Ferrovia Norte-Sul deve ser entregue em abril". Conexão Tocantins. 2009-03-06. Retrieved 2024-02-21.
  23. ^ Richard, Ivan (2010-03-23). "Chuva adia inauguração de trecho da Ferrovia Norte-Sul no Tocantins". UOL. Retrieved 2024-02-21.
  24. ^ "Lula visita obras e inaugura mais um trecho da Ferrovia Norte-Sul". Conexão Tocantins. 2010-09-17. Retrieved 2024-02-21.
  25. ^ Gasparini, Carolina (2012-11-01). "Vale cria nova empresa de logística chamada VLI, diz Valor". InfoMoney. Retrieved 2024-02-21.
  26. ^ "Começam as obras do ramal Sul da Norte- Sul". O Popular. 2011-01-13. Retrieved 2024-02-21.
  27. ^ a b "Ouro Verde/GO - Estrela d'Oeste/SP". Valec. Retrieved 2024-02-21.
  28. ^ "Inaugurados 855 quilômetros da Ferrovia Norte-Sul". Infra S. A. 2014-05-22. Retrieved 2024-02-21.
  29. ^ a b Castilho, Denis; Arrais, Tadeu (2016). "A Ferrovia Norte-Sul e a economia regional do centro-norte do Brasil". UFU. 29 (2): 209–228.
  30. ^ "Fundo de Desenvolvimento Ferroviário é aprovado em comissão mista e segue para a Câmara". Agência Senado. 2018-11-14. Retrieved 2024-02-21.
  31. ^ "Medida Provisória Nº 845 de 2018". Federal Government of Brazil. Retrieved 2024-02-21.
  32. ^ Gerbelli, Luiz Guilherme (2019-03-28). "Rumo vence trecho de 1,5 mil quilômetros da Ferrovia Norte-Sul". G1. Retrieved 2024-02-21.
  33. ^ "Contrato de concessão da Ferrovia Norte-Sul é assinado". ANTT. 2019-07-31. Retrieved 2024-02-21.
  34. ^ Kafruni, Simone (2019-07-31). "Rumo assina contrato de concessão da Ferrovia Norte-Sul em Anápolis". Correio Braziliense. Retrieved 2024-02-21.
  35. ^ "Leilão da Ferrovia Norte-Sul renderá R$ 2,7 bilhões ao Governo Federal". Ministry of Transport. 2019-03-28. Retrieved 2024-02-21.
  36. ^ a b "Inaugurada a Ferrovia Norte-sul entre São Simão e Estrela D'Oeste". GloboRural. 2021-03-04. Retrieved 2024-02-21.
  37. ^ "Vagões da primeira viagem de trem da ferrovia Norte-Sul chegam ao Porto de Santos, SP". G1. 2021-06-05. Retrieved 2024-02-21.
  38. ^ Monteiro, Lucia (2023-05-23). "Ferrovia Norte-Sul conclui integração após 36 anos". O Popular. Retrieved 2024-02-21.
  39. ^ "Governo autoriza construção da ferrovia Açailândia-Barcarena". O Liberal. 2022-01-12. Retrieved 2024-02-21.
  40. ^ "Ferrovia Norte Sul (FNS)". VLI. Retrieved 2024-02-21.
  41. ^ a b c d e f g h i j "Mais um trecho da Ferrovia Norte-Sul será inaugurado". Revista Cultivar. 2023-06-15. Retrieved 2024-02-21.
  42. ^ "Suzano Papel e Celulose inicia produção na fábrica de Imperatriz". EmbalagemMarca. 2014-01-02. Retrieved 2024-02-21.
  43. ^ a b "Trilhos da Ferrovia Norte-Sul avançam pelo Estado e novo trecho está pronto para ser inaugurado". Tocantins State Government. 2010-03-12. Retrieved 2024-02-21.
  44. ^ a b c d e "Gaguim discute infraestrutura de pátios multimodais com presidente da Valec". Conexão Tocantins. 2009-11-04. Retrieved 2024-02-21.
  45. ^ Lins, Aquiles (2008-12-08). "Lula inaugura trecho da Ferrovia Norte-Sul no Tocantins". Tocantins State Government. Retrieved 2024-02-21.
  46. ^ Gouveia, Jorge (2007-11-27). "Governo libera recursos para trecho da Norte-Sul entre Guaraí e Palmas". Tocantins State Government. Retrieved 2024-02-21.
  47. ^ Renovato, Luiza (2008-08-28). "Ferrovia Norte-Sul favorece mercado e mão-de-obra". Tocantins State Government. Retrieved 2024-02-21.
  48. ^ "93,5% da Ferrovia Norte-Sul está concluída no trecho de Palmas a Uruaçu". Surgiu. 2012-11-19. Retrieved 2024-02-21.
  49. ^ "Ferrovia Norte-Sul/GO – Trecho Uruaçu/GO – Anápolis/GO". TCU.
  50. ^ "A Ferrovia Norte-Sul e a integração nacional" (PDF). CNI. 2014.
  51. ^ "A OPERAÇÃO NA FERROVIA NORTE-SUL". Infra S. A. Retrieved 2024-02-21.
  52. ^ a b "Frente parlamentar acompanha de perto projeto da ferrovia Norte-Sul". Alesp. 2013-07-30. Retrieved 2024-02-21.
  53. ^ "ELABORAÇÃO DE PROJETO PARA FERROVIA NORTE-SUL". Monitora Fiesc. Retrieved 2024-02-21.
  54. ^ "Trecho gaúcho da Ferrovia Norte-Sul deverá passar por 29 municípios". Rio Grande do Sul State Government. 2015-08-21. Retrieved 2024-02-21.
  55. ^ "Ferrovia Norte Sul (FNS)". Infra S. A. Retrieved 2024-02-21.
  56. ^ Vidal, Heron (2016-05-28). "Construção de prolongamento da ferrovia Norte-Sul não tem prazo para conclusão". Correio do Povo. Retrieved 2024-02-21.
  57. ^ "Pro Trilhos chega a 21 contratos assinados para criação de novas ferrovias no país". 2022-01-11. Retrieved 2024-02-21.
  58. ^ "Contrato de Adesão N° 5 SNTT MInfra 2022 - Barcarena-PA e Santana do Araguaia-PA - 3G Empreendimentos e Logística SA.zip". ANTT. Retrieved 2024-02-21.
  59. ^ "Suzano pretende construir ferrovia no MA". Revista Ferroviaria. 2011-07-12. Retrieved 2024-02-21.
  60. ^ "ANTT vai assinar contrato de concessão da Ferrovia Norte-Sul". ANTT. 2019-07-30. Retrieved 2024-02-21.
  61. ^ Nascimento, Luciano (2019-07-31). "Contrato de concessão da Ferrovia Norte-Sul é assinado em Anápolis". Agência Brasil. Retrieved 2024-02-21.
  62. ^ a b Furlan, Flavia (2017-08-10). "Corrupção e má gestão marcam a história da ferrovia Norte-Sul". Exame. Retrieved 2024-02-21.
  63. ^ a b "Norte-Sul sai atrás de carga para fazer ferrovia render". Folha de S. Paulo. 2017-10-01. Retrieved 2024-02-21.
  64. ^ "Ferrovia Norte Sul em Colinas já carrega 50 mil toneladas mês". Tocantins State Government. Retrieved 2024-02-21.
  65. ^ "Base de Distribuição de Combustíveis de Petrobras". Seplan. Retrieved 2024-02-21.
  66. ^ "Ferrovia Norte-Sulbusca carga para se tornar rentável". Jornal do Comércio. 2017-10-11. Retrieved 2024-02-21.
  67. ^ Cortes, Andrea (2016-04-18). "Safra recorde intensifica transporte de grãos sobre trilhos no Brasil". Gazeta do Povo. Retrieved 2024-02-21.
  68. ^ Araujo, Agnaldo (2016-03-29). "VLI inaugura terminais em Porto e Palmeirante com investimento de R$ 264 mi". AF Noticias. Retrieved 2024-02-21.
  69. ^ "Itaqui movimenta 16,3 milhões de toneladas de janeiro a outubro". Portos e Navios. 2017-12-27. Retrieved 2024-02-21.
  70. ^ "VLI cria nova rota para escoamento de soja para o Porto de Itaqui (MA)". Transporta Brasil. 2017-04-08. Retrieved 2024-02-21.
  71. ^ "Cresce a movimentação de grãos no Centro-Norte; VLI já movimentou mais de cinco milhões de toneladas este ano". Portos e Navios. 2017-11-28. Retrieved 2024-02-21.
  72. ^ "Grãos: VLI movimenta 25% mais volume pelo norte em 2019". Isto É. 2020-02-10. Retrieved 2024-02-21.
  73. ^ "VLI transportou quase 8 mi de toneladas de grãos em trecho entre Porto Nacional e Açailândia". Porto Nacional City Hall. 2020-02-04. Retrieved 2024-02-21.
  74. ^ "Bilhões de reais são jogados fora em obras paradas pelo Brasil". G1. 2013-04-18. Retrieved 2024-02-21.
  75. ^ Morais, Fernanda (2023-06-15). "SULLula e José Sarney inauguram conclusão da ferrovia em Goiás". DM Anápolis. Retrieved 2024-02-21.
  76. ^ "RELATÓRIO DE GESTÃO DO EXERCÍCIO DE 2015" (PDF). Infra S.A. 2015.
  77. ^ "Palmas/TO - Anápolis/GO". Infra S. A. Retrieved 2024-02-21.
  78. ^ "Terminal rodoferroviário inaugurado em Iturama, no Triângulo Mineiro, representa marco logístico no estado". Jornal de Uberaba. 2022-06-10. Retrieved 2024-02-21.
  79. ^ "Rumo inaugura Terminal Rodoferroviário em Rio Verde (GO)". Portos e Navios. 2021-07-28. Retrieved 2024-02-21.
  80. ^ "Usina Coruripe e Rumo inauguram terminal rodoferroviário em Minas Gerais". Rumo Logistica. 2022-06-09. Retrieved 2024-02-21.
  81. ^ "Ferrovia Norte-Sul é entregue após quase 4 décadas". Folha de S. Paulo. 2023-06-15. Retrieved 2024-02-21.